![]() ![]() SFHA changes will be published in the Federal Register SFHA changes will be published in your local newspapers March 2016* will begin the 90-day appeal period *estimated time Appeals are for all SFHA changes Hamilton & Suwannee Counties will have a 90-day appeal period for all changes to Special Flood Hazard Areas. ![]() Prelimin ary Map Products Novemb er 17, 2015 PDCC Meeting Februar y 8, 2016 Appeal/ Comment Period March - June 2016 Letter of Final Determi nation Issued July 2016 January 2017 Effective Maps Community Compliance Period July 2016 – January 2017 We are here Preliminary Maps Issued PDCC Meeting and Public Open House End of Appeal & Comment Period Letter of Final Determination Effective Maps Preliminary Phase Meetings 90-Day Appeal & Comment Period Resolve Appeals & Finalize Map Products 6-Month Compliance Period These LOMCs would originally have had multiple structure or multiple properties identified as the focus of the determination. There are four possible categorizations for LOMCs on the SOMA, as follows: Category 1 – LOMCs Incorporated Category 2 – LOMCs Not Incorporated Category 3 – LOMCs Superseded Category 4 – LOMCs To Be Re-determined LOMCs in Category 2 will be issued on a revalidation letter when the effective maps are issuedġ1 Summary of Map Actions Reasons a LOMC would be added to Category 3 (superseded) Lowest Adjacent Grade to the structure (LAG) is below the proposed Base Flood Elevation Lowest Ground/Lot Elevation (LLE) is below the proposed Base Flood Elevation Category 4 includes LOMCs In Question which cannot be entirely revalidated nor can they be entirely superseded. Redelineation of approximately miles of the Suwannee River Redelineation of Suwannee River Unnamed Tributary Revision of 6 FIRM Panels Suwannee County Regulatory Redelineation of approximately 3.5 miles of the Suwannee River Revision of 3 FIRM Panels Non-Regulatory Flood Depth & Analysis Grids for New Studies & Redelineation Miles, including Picket & Adams Lakes Changes Since Last FIRM GIS Layer Flood Risk Map & Report Average Annual Loss GIS Layer for CountyĨ Revisions to the Regulatory Products Flood Insurance Rate Mapĩ Revisions to the Regulatory Products Flood Insurance Report Previous Projects Hamilton County – Revised Countywide Suwannee County – Initial Countywide, Live Oak Revision Existing Projects Upper Suwannee Risk MAP Amec Foster Wheeler (formerly AMEC) & North Florida Professional Services Parts of Columbia, Hamilton and Suwannee Counties Discovery Meeting – Interim Meetings – Summer 2014 FRR / Resilience Meeting – Preliminary Issuance for Hamilton and Suwannee Counties – Ħ Scope of Work Hamilton County Regulatory Understanding of project scope and changes to mapping products feedback on preliminary mapping products understanding of statutory rights, process, and schedule forward understanding of regulatory requirements Overview of Preliminary Products Overview of Map Adoption Process Looking at the Maps Questions and AnswersĤ Meeting Objectives Community Engagement Presentation on theme: "Preliminary DFIRM Community Coordination (PDCC) Meeting Hamilton & Suwannee Counties, FL February 8, 2016."- Presentation transcript:ġ Preliminary DFIRM Community Coordination (PDCC) Meeting Hamilton & Suwannee Counties, FLĢ Agenda Introductions Study Process and Timeline ![]()
0 Comments
Leave a Reply. |